Mt Owen CHPP Reagent Dosing Station
Aqua Energy Group were engaged to design, supply, install & commission a complete Reagent Plant to suit our client’s requirements.

- Contract value
- $1 Million
- Duration
- 9 months
Equipment
- 2x double- sided custom designed dosing pump cabinets for hazardous and non-hazardous fluids,
- 1x MCC
Description
This project uses two double sided pump cabinets with a mixture of hazardous–rated and standard dosing pumps to pump set amount of liquid into the thickening plant on site. These cabinets are accompanied by a customised switchboard for full operation of the units. Two large 40FT containerised fuel storage units were supplied as part of our package, flow-monitoring, all lighting, and complete installation project.
Challenges
Aqua Energy Group was able to navigate very strict environmental requirements and tight timeframe for the customer to get their new coal fines handling plant up and operation ASAP.
More water management systems projects

Centennial Coal Water Management System

BHP/BMA Tailings Storage Management Project

NSW Water Utilities Drought Relief
Planning a similar project?
Design, supply, install and commissioning delivered as one turnkey package, built to Australian and International Standards. A member of our engineering team will respond within 24 hours.