Reagent Dosing · Hunter Valley, NSW

Mt Owen CHPP Reagent Dosing Station

Aqua Energy Group were engaged to design, supply, install & commission a complete Reagent Plant to suit our client’s requirements.

Aerial view of the reagent dosing cabinets and containerised storage units at the Mt Owen CHPP, Hunter Valley, NSW
Contract value
$1 Million
Duration
9 months

Equipment

  • 2x double- sided custom designed dosing pump cabinets for hazardous and non-hazardous fluids,
  • 1x MCC

Description

This project uses two double sided pump cabinets with a mixture of hazardous–rated and standard dosing pumps to pump set amount of liquid into the thickening plant on site. These cabinets are accompanied by a customised switchboard for full operation of the units. Two large 40FT containerised fuel storage units were supplied as part of our package, flow-monitoring, all lighting, and complete installation project.

Challenges

Aqua Energy Group was able to navigate very strict environmental requirements and tight timeframe for the customer to get their new coal fines handling plant up and operation ASAP.