Mining · Moranbah, QLD
BHP/BMA Tailings Storage Management Project
Aqua Energy Group successfully installed this infrastructure project which included the complete design, supply and commission of all electrical and mechanical aspects.

- Contract value
- $2 Million
- Duration
- 18 months
Equipment
- 2 complete pontoon pump stations
- Diesel dewatering pump station
- Fuel pod
- Substations, transformers, control panels
- Associated pipework and valving
Description
The project included 2 dual electric pontoons, access walkways, 2 kiosk substations, all mine spec control panels and instrumentation. Aqua Energy Group successfully delivered the challenging project for BHP and provided a full turn-key solution that incorporated all commissioned and integration of electrical and pipework manifolds.
Challenges
- Operational Mine Site
- Complex Tailing Project
- Integration with other Contractors
- High-end Engineered Solution
More Projects
More water management systems projects

Water Management
Centennial Coal Water Management System
Lithgow, NSW
4× demountable pump buildings · 2× switchrooms · $5.5M · 12 months

Reagent Dosing
Mt Owen CHPP Reagent Dosing Station
Hunter Valley, NSW
2× double-sided dosing pump cabinets · $1M · 9 months

Water Management
NSW Water Utilities Drought Relief
Inland NSW
2× pontoons · 6× pumps at 660 L/s · 300 ML/day · $3.8M · 6 months