Fire & Safety · Hunter Valley, NSW
Wambo United Modular Pump Station
Aqua Energy Group were engaged to design, supply, install and commission a complete turnkey fire protection plant for the UG coal mining industry.

- Contract value
- $1 Million
- Duration
- 9 months
Equipment
- Complete modular fire pumpstation
- 2x large 500 kL storage fire water tanks
- Associated piping and electrical works.
Description
This project incorporated the complete design, supply and installation of all equipment according to MDG15 requirements.
Challenges
Aqua Energy Group was able to navigate very strict environmental requirements, an operational mine site, and a tight timeframe.
More Projects
More mining pumps projects

Dewatering
Lake Tekapo – New Zealand Canal Remediation
Tekapo, New Zealand
13× 1500 L/s @ 30 m · 13× 400 L/s @ 60 m · $4M

Fire & Safety
Ravensworth Fire Pump Station
Ravensworth, Hunter Valley, NSW
Diesel + electric hydrant and sprinkler pumps · $2M · 12 months

Fire & Safety
Cobar Fire Pump Enclosure
Cobar, NSW
2× 55 L/s @ 1200 kPa booster pumps · $250,000 · 4 months