Fire & Safety · Appin, NSW

South32 Fire Pump Station

Aqua Energy Group were engaged to design, supply, install & commission a complete modular fire pump station for South32 in Appin, NSW.

Containerised modular fire pump station with doors open for South32 at Appin, NSW
Contract value
$5 Million
Duration
9 months

Equipment

  • Complete modular fire pumpstation fitted with diesel hydrant booster, electric hydrant booster and Cummins engine
  • All associated interconnecting pipework and electrical works

Description

All civil, electrical, and mechanical requirements were met to ensure the fire pump package was in line with MDG15 standards. This fire pump system was part of a major project in this mine consisting of a sewage treatment plant, potable water tanks, and fire water tanks. Pumps and reticulation equipment was also supplied.

Challenges

Aqua Energy Group worked within a tight timeframe to ensure the customer received their fire pump station rapidly. Strict mining standards were adhered to for the duration of this project.

Planning a similar project?

Design, supply, install and commissioning delivered as one turnkey package, built to Australian and International Standards. A member of our engineering team will respond within 24 hours.