Aqua Energy Group designed and installed a borehole pump system for an underground mine in Emerald QLD to maintain the underground operating water levels.

Crane and crew installing the column pipe for a 330 kW borehole submersible pump at an underground mine, Emerald, QLD
Contract value
$4.5 million

Equipment

  • 330 kW Electric Submersible Pump (50l/s)
  • ESP Monitoring System
  • Cabling and Electrical Equipment
  • Pipework and Supports
  • Switchboard/Kiosk

Description

This package included all mechanical and electrical components.

Challenges

The work site was located in a remote area with minimal phone reception, making communication difficult.