Booster · QLD

Pressure Booster Pump Station

Aqua Energy Group designed, supplied and installed a replacement high pressure booster pump station for a mine site in QLD.

Five vertical multistage booster pumps on a stainless steel manifold with a pressure tank, installed in the mine site pump room, QLD
Contract value
$2.5 million

Equipment

  • 5 x CRN185 200 kW vertical multistage pumps (140 L/s at 220 m head)
  • 850 L pressure tank and gauges
  • Interconnecting pipework and valves
  • 4 x filters on pump suction side
  • Switchboard
  • Electrical instrumentation

Description

AEG modified the existing pump room to accommodate the large pump set and developed a comprehensive plan for safe and easy installation.

Challenges

Aqua Energy Group completed a successful Factory Acceptance Test for the entire system before site installation.

Planning a similar project?

Design, supply, install and commissioning delivered as one turnkey package, built to Australian and International Standards. A member of our engineering team will respond within 24 hours.