Booster · QLD
Pressure Booster Pump Station
Aqua Energy Group designed, supplied and installed a replacement high pressure booster pump station for a mine site in QLD.

- Contract value
- $2.5 million
Equipment
- 5 x CRN185 200 kW vertical multistage pumps (140 L/s at 220 m head)
- 850 L pressure tank and gauges
- Interconnecting pipework and valves
- 4 x filters on pump suction side
- Switchboard
- Electrical instrumentation
Description
AEG modified the existing pump room to accommodate the large pump set and developed a comprehensive plan for safe and easy installation.
Challenges
Aqua Energy Group completed a successful Factory Acceptance Test for the entire system before site installation.
More Projects
More mining pumps projects

Dewatering
Lake Tekapo – New Zealand Canal Remediation
Tekapo, New Zealand
13× 1500 L/s @ 30 m · 13× 400 L/s @ 60 m · $4M

Fire & Safety
Ravensworth Fire Pump Station
Ravensworth, Hunter Valley, NSW
Diesel + electric hydrant and sprinkler pumps · $2M · 12 months

Fire & Safety
Wambo United Modular Pump Station
Hunter Valley, NSW
2× 500 kL fire water tanks · MDG15 · $1M · 9 months
Planning a similar project?
Design, supply, install and commissioning delivered as one turnkey package, built to Australian and International Standards. A member of our engineering team will respond within 24 hours.