Moolarben UG Coal Mine Modular Fire Pump Station Project
Aqua Energy Group were engaged to design, supply, install & commission a complete turn-key fire protection plant for the UG coal mining industry.

- Contract value
- $1 Million
- Duration
- 9 months
Equipment
- Complete modular fire pumpstation
- 2 X large 500kl storage fire water tanks
- Associated interconnecting Pipework
- Electrical works
Description
This project incorporated the complete design, supply, installation and commissioning of this package. This involved a complete modular fire pumpstation, water supply pumpstation, 2 X 500KL fire water tanks, all civil requirements, all electrical requirements, and all mechanical requirements to meet MDG15 requirements.
Challenges
Aqua Energy Group was able to navigate very strict environmental requirements, an operational mine site and tight timeframe for the customer to get their new UG Fire Water Modular Booster Pumpstation up and operational.
More mining pumps projects

Lake Tekapo – New Zealand Canal Remediation

Ravensworth Fire Pump Station

Wambo United Modular Pump Station
Planning a similar project?
Design, supply, install and commissioning delivered as one turnkey package, built to Australian and International Standards. A member of our engineering team will respond within 24 hours.