WATER MANAGEMENT EXPERTS

Completed Projects

NSW WATER UTILITIES DROUGHT RELIEF

March 6, 2024

PROJECT

NSW Water Utilities Drought Relief

INDUSTRY

Infrastructure

LOCATION

Inland, NSW Australia

EQUIPMENT

Containerised Switch rooms, 415V

MCC, 2 x pontoons, 6xpumps @660L/s

each Pump, Pipelines/ Valving

DURATION

6 months

VALUE

$3.8 Million

DESCRIPTION

The Project Included the Design, supply, and delivery of two pontoons delivering up to 300ML a day of Freshwater to a coffer dam arrangement. The Project also consists of a 415V Containerised Switch room, heavy-duty trailing cable, and a flexi DN600 pipeline arrangement for the two pontoons. This project was a full D&C by the Aqua Energy Group Engineering team.

CHALLENGES

This Project was won by Aqua Energy Group on the merit that we could supplu a complete drought relief package in a short time frame. We are proud that we could not only deliver the project in the time frame specified, but we were also able to use all Australian made products.