We are a dynamic, unique

electro-mechanical solution provider

with over 20 years of experience

Welcome to Aqua Energy Group

At Aqua Energy Group we design, supply, install, commission and maintain water and slurry pump systems including electrical equipment that can be selected “off the shelf” or tailored to suit your needs. All equipment and systems are designed to the highest Australian and International engineering standards.


Aqua Energy Group is a specialised engineering, construction and asset management contractor that is positioning to be a major provider to the Renewables, Civil Infrastructure, Resources and Utilities Sectors across Australia and New Zealand.


Our reputation for delivering complex, innovative solutions to the market continues to grow and our strong forward projections ensures we will continue to attract the best employees through our involvement in challenging projects.


We value our people and place the strongest emphasis on safety. We value our customers and commit to maintaining compliance to all relevant Australian Standards. This ensures an on - time, quality solution to meet expectations each time they partner with Aqua Energy Group.

Find our Solutions

List of Services

Aqua Energy Group Projects

By Client Care 27 Aug, 2024
PROJECT Weed & Seed Compliant Wash System INDUSTRY Military LOCATION Shoalwater Bay, QLD EQUIPMENT MobyDick ConLine KIT 400MB including Incoming and exit ramps Chassis wash Side walls Third nozzle tube 10ft containerized pump system & SMART Wash controller DURATION 16-18 weeks DESCRIPTION Aqua Energy Group supplied and commissioned a 4m long automated wash system in Shoalwater Bay QLD. The wash system is a hot-dip galvanized, water carrying wash unit with splash protection side walls. The splash walls have triple nozzle bars (4m long) on both sides made from galvanized steel. Each nozzle is 7mm in diameter and works on an oscillating function with low-pressure, high-volume output. This system was designed to wash up to 50 vehicles (15 tonne axle load) over a 10-hour shift. CHALLENGES Aqua Energy Group navigated strict biosecurity regulations regarding Weed & Seed compliance to ensure the system was fit for purpose. There were also strict industry regulations that AEG had to consider while completing this project.
28 Mar, 2024
PROJECT Upgrade of the existing integrated water management system. INDUSTRY Mining LOCATION Lithgow, NSW Australia EQUIPMENT Centrifugal Pumps and Pump Motorset 4 x Demountable mobile pump buildings 2 x Complete switchrooms DURATION 12 months VALUE $5.5 Million DESCRIPTION Aqua Energy Group were chosen to design, supply, and construct a water management system in Lithgow, Australia. This included an upgrade of an existing water management system, demountable pump buildings and two complete switchrooms. Aqua Energy Group managed everything from civil works through to final commissioning and hand over of the project. CHALLENGES Aqua Energy Group was able to navigate very tight environmental requirements and a tight timeframe. Dewatering was operational throughout the entire project.
21 Mar, 2024
PROJECT Modular Fire Pump Station INDUSTRY Mining LOCATION Mt Thorley EQUIPMENT Complete modular fire pumpstation including diesel hydrant booster, electric hydrant booster and Cummins engine. All associated interconnecting pipes and electrical work were supplied. DURATION 12 months DESCRIPTION Aqua Energy Group were engaged to design, supple, install & commission a complete modular fire pumpstation in Mt Thorley NSW. All civil, electrical, and mechanical requirements were met to ensure the package was in line with MDG15 standards. CHALLENGES Aqua Energy Group ensured the fire pump station adhered to strict mining standards.
21 Mar, 2024
PROJECT Modular Fire Pump Station INDUSTRY Mining LOCATION Hunter Valley, NSW Australia EQUIPMENT 1x complete modular fire pumpstation 2x large 500kL storage fire water tanks and all associated piping and electrical works. DURATION 9 months VALUE $1 Million DESCRIPTION Aqua Energy Group were engaged to design, supply, install and commission a complete turnkey fire protection plant for the UG coal mining industry. This project incorporated the complete design, supply and installation of all equipment according to MDG15 requirements.  CHALLENGES Aqua Energy Group was able to navigate very strict environmental requirements, an operational mine site, and a tight timeframe.