CENTENNIAL COAL WATER MANAGEMENT SYSTEM

Mar 28, 2024

PROJECT

Upgrade of the existing integrated water management system.


INDUSTRY

Mining


LOCATION

Lithgow, NSW Australia


EQUIPMENT

Centrifugal Pumps and Pump Motorset

4 x Demountable mobile pump buildings

2 x Complete switchrooms


DURATION

12 months


VALUE

$5.5 Million


DESCRIPTION

Aqua Energy Group were chosen to design, supply, and construct a water management system in Lithgow, Australia.

This included an upgrade of an existing water management system, demountable pump buildings and two complete switchrooms. Aqua Energy Group managed everything from civil works through to final commissioning and hand over of the project.


CHALLENGES

Aqua Energy Group was able to navigate very tight environmental requirements and a tight timeframe. Dewatering was operational throughout the entire project.