Project Description

PONTOON PUMP STATION
(RAVENSWORTH NORTH)

Aqua Energy Group were contracted to supply, design and install a Pontoon Pump Station for raw water at a mine site in the Hunter Valley, NSW. 

Project: Pontoon Pumping Station
Industry: Mining
Location: Hunter Valley, NSW Australia
Equipment: 3 No. 210m @ 60L/S (200kW), 3 No. 100m @60L/S (100kW), 3 No. 100m @310L/S (450kW) Floating Pontoons
Duration: 6 Months
Value:  $3.2 Million
Description: Design, Supply and Install Pontoon mounted Pump Stations for Raw Water
Challenges: Corrosive water PH Levels, Located at bottom of void and in an isolated area, Short Programme, Long lead for plant, Multiple subcontractors/suppliers to coordinate.