Project Description
FIRE PUMP ENCLOSURE
(COBAR)
Aqua Energy Group were commissioned to complete a Diesel Fire Pump Enclosure, complete with muffler, exhaust and rain cap, for a remote Mine site in Cobar, NSW.
Project: Diesel Fire Enclosure
Industry: Mining/Fire
Location: Cobar, NSW Australia
Equipment: Diesel AS2941-2013 Hydrant/Sprinker Booster Pump (55L/S @ 1200KPA), Electric AS2941-2013 Hydrant /Sprinkler Booster Pump (55L/S @ 1200KPA), Jacking Pump System, Complete Base Frame
Duration: 4 Months
Value: $250,000
Description: The supply and installation of a Diesel Fire Pump Set, complete with a muffler, exhaust and rain cap to protect the system from the elements
Challenges: Remote site location.